After 10 years of planning, environmental permits, public meetings, design, and construction, the project was completed in 2018. The original transmission line is still in place and can be used as a backup if it's ever needed.
经过 10 年的规划、环境许可、公众会议、设计和施工,该项目于 2018 年完成。原来的输电线路仍然存在,如果需要,可以作为备用线路。