Despite the scheme requiring an extensive amount of demolition works prior to construction, the project team sought to recycle 75% of demolition waste; and used an extensive tracking system to identify locally sourced materials, minimising transport emissions.
尽管该工程要求在施工前进行大量的拆卸工程,但项目小组仍设法回收 75% 的拆卸废物,并采用广泛的追踪系统来甄别本地物料,尽量减少运输过程中的废气排放。