As each storey of the core is completed, PERI's innovative climbing sequence transfers the load of the formwork system from the upper working brackets, shown here in red, to the lower climbing brackets, shown in yellow.
随着核心层的每一层的完成,PERI 创新的攀爬顺序将模板系统的负载从上面的工作支架(这里显示为红色)转移到下面的攀爬支架(这里显示为黄色)。