Central London Railway




The Central London Railway (CLR), also known as the Twopenny Tube, was a deep-level, underground "tube" railway that opened in London in 1900. The CLR's tunnels and stations form the central section of the London Underground's Central line.
The railway company was established in 1889, funding for construction was obtained in 1895 through a syndicate of financiers and work took place from 1896 to 1900. When opened, the CLR served 13 stations and ran completely underground in a pair of tunnels for 9.14 kilometres (5.68 mi) between its western terminus at Shepherd's Bush and its eastern terminus at the Bank of England, with a depot and power station to the north of the western terminus. After a rejected proposal to turn the line into a loop, it was extended at the western end to Wood Lane in 1908 and at the eastern end to Liverpool Street station in 1912. In 1920, it was extended along a Great Western Railway line to Ealing to serve a total distance of 17.57 kilometres (10.92 mi).