Engineering change notice
An engineering change notice (ECN), or change notice, is a document which records or authorizes a change to a specific design. The reasons for the change should also be recorded.
Following sound engineering principles, control and documentation are necessary to ensure that changes are built upon a known foundation and approved by relevant authorities.